System Testing
Ensure you have informed your Alarm Receiving Centre that you are ready
to test your Dualcom Product.
1. Reconnect the mains supply to the control panel.
2. Dualcom Mk2. Move the Power Switch to the On position (See Fig 2).
Note that the power switch may be a yellow slide switch or a removable
jumper link. This will power-up the Dualcom and ‘register’ it onto the VDN
network. Registration will take about 45 seconds with the Radio LED On,
the SERVICE LED flashing and the Signal Strength LEDs Off. See page 17.
Whenever you apply power to the Dualcom (using the Power Switch/Jumper
or by shorting the Reset pins) during installation or during a regular mainte-
nance visit, the Dualcom will ‘register’ onto the VDN network. See page 18.
Dualcom Mk1. Press and hold the black TEST button. Connect power to
the Dualcom. Keep the TEST button held until the SERVICE LED starts to
flash. Release the TEST button. See page 17 and Fig 6.
Note: If the NVM is an incorrect type, faulty, fitted incorrectly or has been
incorrectly programmed, the Red and Yellow Communication LEDs will flash
alternately. If there is a problem with the VDN radio path, the Yellow Com-
munication LED will flash. If there is a problem with the PSTN telephone
line, the Red Communication LED will flash. See Appendix 1 for LED fault
indications.
4. To test both reporting paths to the ARC, momentarily short the Test pins on
the Dualcom see Fig 1 and 2. This will cause Dualcom to send a test signal
to the ARC on both the PSTN telephone path and the VDN radio path.
Once the test pins are shorted, the two communication LEDs will illumi-
nate, (Red for PSTN and Yellow for Radio). During communication the LEDs
will indicate the progress of the call, see Appendix 1. When a path has
successfully communicated with the ARC its associated LED will go off.
During Test calls (started using the Test pins), both paths will send a test
call. The ARC should receive two test calls.
Ensure after the test that both Radio and PSTN LEDs are off; this will mean
that the test calls on both paths are complete.
5. Now trigger all the used inputs on the Dualcom. This should be done by
Setting the Control Panel and triggering an alarm condition. If P/A or Fire
circuits are being monitored these should also be triggered and tested.